Objectives of MUTP
MUTP Phase I
(Rail
Component)
5th & 6th Lines Kurla - Thane
Optimization of Central Railway
Optimization of Harbour line
5th line Mahim - Santacruz
Quadrupling of Borivali-Virar section
Optimization of Western Railway
DC to AC Conversion
EMU procurement & manufacture
Stabling lines for EMUs
Maintenance facilities for EMUs
Virar Car shed
Track Machines
Institutional strengthening & studies
Resettlement & Rehabilitation
Infrastructural inputs in MUTP Phase I
-
Addition of 93 track kms - base figure 790 kms
[Excluding loop line and yards] (34 kms in Thane-Turbhe-Vashi
section and 53 kms in Virar-Borivali section under
MUTP have since been added).
-
Induction of dual voltage 101 new 9-car rakes.
51 on additional account and 50 on conversion
account.
-
Resettlement & Rehabilitation of about 15,000
Project Affected Households.
-
Running of 12-car rakes on all lines (excluding
Harbour line) by lengthening of all platforms.
-
Achieving 3 minutes headway on all the lines
(re-spacing of signaling to be done).
-
DC
to AC conversion in all suburban sections except
Thane-CSTM section. (to be taken up in Phase II).
Benefits of
MUTP Phase I
-
550
new trains 25% increase in total trains per
day.
-
On
fast line, all trains will be of 12 cars. On
slow line, 20% of trains will be of 12 cars.
-
Vehicle kms per day will increase by 33 %.
-
Overcrowding during peak hour peak direction will
come down from existing, over 5000 commuters to
3600 commuters per 9-car rake.
MUTP Phase
II
-
5th
& 6th lines CSTM - Kurla
-
5th
& 6th lines Thane - Diwa
-
6th
line Borivali - Mumbai Central
-
Extension of Harbour Line from Andheri to Goregaon
-
DC
to AC Conversion (CSTM - Thane section)
-
Station Improvement and Trespassing Control
Scheme.
-
Resettlement & Rehabilitation.
-
EMU
procurement & manufacture.
-
Maintenance facilities for EMUs.
-
Stabling lines for EMUs.
-
Technical Assistance & Institutional
Strengthening.
Infrasturctural inputs in MUTP Phase II
-
Addition of 88 track kms - existing 790 kms and 93
kms being added in MUTP Phase I.
-
96
new 9-car rakes.
-
DC
to AC conversion in Thane - CSTM section (172
Track km), completing the DC-AC conversion on
Mumbai Suburban system.
-
Resettlement & Rehablitation of about 3,000
Project Affected Households.
Benefits of MUTP Phase II
-
Will
segregate the suburban train operations from the
main line passenger & freight services.
-
All
trains running on the suburban lines will be of 12
car.
-
800
New trains - Increase of 30 % over and above MUTP
Phase I.
-
Bringing down the passengers per 9 coach train to
3000 as against existing 5000 and 3600 on
completion of MUTP Phase I.
|